Menu
PDC logo
PDC

"PDC’s (formerly 4DGG) quality work and sensitivity to fast track schedules help make projects a success. Their willingness to accommodate fabricators & erectors specific needs coupled with timely submittal schedules is also evident. Their in-depth knowledge of steel fabrication and erection is obviously founded on a sound base of experience."

Ray Clarke, Engineering Manager, Owen Steel Company, World Trade Center Tower 3 Project, NYC Sanitation Garage Project

Ray Clarke logo

Integrated Management System

Quality is a core value and integral part of PDC’s TW3 (The Way We Work) management system; it is fundamental to the strong relationships we have with our clients.

Internationally Accredited Quality Systems extend across the lifecycle of every project, from training and resource management right through to procurement and final design, regardless of time pressures.

Our quality procedures maintain an objective of zero re-work during construction; quality data in results in quality data out. TW3 encompasses our business systems and workflows to ensure data accuracy is very close to 100%, a critical factor in effective BIM implementation. 

Our management team works with clients to address technical issues upfront, ensuring efficient execution throughout the project.

TUV SUD and JAS-ANZ QA logos

In addition, PDC's systems ensure full communication of project requirements and management of subcontractors. Our business and quality systems utilize our advanced technology, all of which is accredited to the requirements of ISO 9001:2008.

PDC has a fully integrated and traceable system so that information can be retrieved at any time.  With our focus on employing and maintaining experienced personnel, PDC ensures production of reliably accurate 3D BIM models, drawings, design documentation and calculations that are easily interpreted by our range of clients. 

 

Policies

Quality Policy